Rhode Island College St. Joseph Nurse Anesthesia
✓ VerifiedProvidence, RI
Application portal & deadline verified against the official program source.
Program details
- Degree
- DNP
- Length (months)
- 36
- Format
- Hybrid
- Min GPA
- 3
- Min science GPA
- 3
- Min ICU months
- 12
- Acceptance rate (%)
- 20
- Avg board pass rate (%)
- 96
- Tuition (total)
- 60000
- Seats per class
- 15
- GRE required
- No
- Letters required
- 3
- Application deadline
- 2026-10-01
Rhode Island College St. Joseph Nurse Anesthesia — frequently asked
What GPA does Rhode Island College St. Joseph Nurse Anesthesia require?
Rhode Island College St. Joseph Nurse Anesthesia lists a cumulative GPA of at least 3.0 and a science GPA of at least 3.0. Minimums are a floor, not a target — admitted applicants are frequently above them, so treat the stated number as the bar to clear rather than the goal.
How much ICU experience does Rhode Island College St. Joseph Nurse Anesthesia require?
At least 12 months of critical-care experience. Most programs want that experience to be recent, in an adult ICU, and at high acuity — the unit you work in usually matters as much as the number of months.
Does Rhode Island College St. Joseph Nurse Anesthesia require the GRE or CCRN?
On the data we have, Rhode Island College St. Joseph Nurse Anesthesia does not require the GRE. Requirements change between cycles — confirm on the program's official page before you rely on it.
How long is the Rhode Island College St. Joseph Nurse Anesthesia program?
About 36 months of full-time study, awarding the DNP. Nurse anesthesia programs are front-loaded and clinically intense; most discourage working during the program.
How much does Rhode Island College St. Joseph Nurse Anesthesia cost?
Roughly $60k in total tuition on the figures we have, before fees and living costs. Because most students can't work much during the program, budget for living expenses across the full length as well.
When is the Rhode Island College St. Joseph Nurse Anesthesia application deadline?
The deadline on file is 2026-10-01. Deadlines shift year to year — always verify the current cycle on the program's own page.